WEEK # | TOPICS | KEY DATES |
---|---|---|
Part A - Systems Engineering for Digital Fabrication | ||
1 | Digital Mock-Ups Tall Buildings | |
2 | Tall Building Design Tower Design Analysis | Module 1: Analysis of existing tower design due |
3 | Research Case - Design Production Mock-Up - Control | Module 1: Analysis of existing tower design due |
4 | Materials and Assemblies | Module 1: Material and manufacturing system analysis due |
5 | Façade Design | Module 1: Façade design due |
6 | Façade Redesign | Module 1: Façade redesign and packaging due |
7 | Field Trip to NYC (Grimshaw and Sorkin) | |
Part B - Design Production | ||
8 | Tower Design 1 | Module 2: Tower production planning and review due |
9 | Tower Design 2 | Module 2: Tower production 1 due |
10 | Tower Design 3 | Module 2: Tower production 2 due |
11 | Field Trip to London Design Adjustment | |
12 | Redesign | Module 3: Redesign due |
13 | Final Presentation | Module 3: Final review due |